Update on 07/17/2021
Leaf65:
- All CNC millings have been finished.
- Solder version PCBs have been arrived.
- Packaging boxes have been arrived.
- All PORONs have been arrived
- E-coating preparation (bead blasting) has been done.
Time80RE leftover:
- There will be some leftover units. Some of the parts have been returned for refinishing.